Investigation: why have so few fire doors been replaced since Grenfell?

How much progress has been made on rectifying issues with fire doors in council homes? Nathaniel Barker finds out.  Picture by Grenfell United

Linked InTwitterFacebookeCard
Sharelines

Investigation: why have so few fire doors been replaced since Grenfell? #ukhousing

"Among the 44 councils that have identified non-compliant or potentially non-compliant doors since March 2018, half are yet to replace a single one" Read our investigation into the safety of fire doors in council homes #ukhousing

How much progress has your council made on fixing faulty fire doors? Find out with our exclusive investigation #ukhousing

Since the Grenfell Tower disaster, cladding has dominated the debate on fire safety. However, while the aftermath of the tragedy has shone a light on the wide use of dangerous cladding materials across the country, what it has revealed about fire doors is equally concerning.

In March 2018, the Metropolitan Police revealed that it had tested an undamaged flat entrance fire door taken from the tower. It withstood fire and smoke for just 15 minutes, despite being designed to offer 30 minutes’ protection in line with building requirements.

Further failures in tests on a wider range of products commissioned by the government were described by communities secretary James Brokenshire as evidence of “a broader issue across the fire door market”. A five-month moratorium on the sale of glass reinforced plastic (GRP) composite fire doors was quietly agreed. GRP doors are particularly popular with social landlords largely for being relatively cheap to produce.

Snapshot data from government tests published in February showed that only three of 12 GRP door models tested met the 30-minute requirement, while two failed after less than 10 minutes. The government is still working with National Trading Standards and the Association of Composite Door Manufacturers to develop a remediation action plan.

Inside Housing has carried out the most comprehensive research to date about the scale of fire door issues in England’s council housing stock and reveals the glacial pace at which these issues are being fixed.

The picture is as frustrating as it is worrying. Through the Freedom of Information Act, we obtained data on 326,863 fire doors in blocks of flats owned by 98 councils – which together own well over half of the nation’s local authority housing stock.

A handful of councils that responded did not know how many doors are installed across their stock, and these have not been included.

Of all the doors counted, the councils believe that 33,522 (10.3%) are unlikely to satisfy the 30-minute standard, while several are still carrying out surveys to determine whether any of their doors are a concern.


READ MORE

Barking fire residents ‘had to break through doors’ in desperate bid to escape flamesBarking fire residents ‘had to break through doors’ in desperate bid to escape flames
Last risk assessment on Grenfell Tower warned fire doors were non-compliantLast risk assessment on Grenfell Tower warned fire doors were non-compliant
Mock trial shows seriousness of fire door safetyMock trial shows seriousness of fire door safety
Special investigation – The lost lessons of Lakanal: how politicians missed the chance to stop GrenfellSpecial investigation – The lost lessons of Lakanal: how politicians missed the chance to stop Grenfell
Staff must receive the protection they deserveStaff must receive the protection they deserve

Lord Gary Porter, chair of the Local Government Association, says that councils “have been failed” by the GRP door and testing industries.

Among the 44 councils that have identified non-compliant or potentially non-compliant doors since March 2018, half are yet to replace a single door. That includes Kensington and Chelsea Council – the owner of Grenfell Tower – which suspects that 931 of its 5,345 flat entrance fire doors are not fit for purpose. A spokesperson for the council said that a replacement programme is due to start in July, and that new doors are currently being installed in buildings “of specific concern”.

Overall, the councils were able to confirm that just 2,689 problem doors have been replaced – 8% of those deemed unlikely to meet safety standards. Some said that replacements are ongoing but they were unable to provide figures.

The data points to widespread and multifaceted confusion regarding fire doors that helps to explain why, two years on from Grenfell, remediation has been so slow.

Much of this confusion arose in July 2018, when the Ministry of Housing, Communities and Local Government (MHCLG) issued Advice Note 16, to help landlords replace fire doors. This document stated that replacement fire doors needed test evidence that the product could resist fire and smoke adequately from both sides.

The advice neglected, however, to specify that the ‘both-sides standard’ applied only to composite doors and not traditional fire doors, which are usually made of timber or steel. This point was clarified a month later by the government in Advice Note 17, but Inside Housing heard that in the interim some landlords needlessly cancelled orders for fire doors, sent back deliveries or refused payments after finding that they had not been tested from both sides.

Kevin Underwood, technical director at the British Woodworking Federation (BWF), says misunderstandings about what constitutes a safe fire door endure. “The BWF was concerned that the confusion around the testing and certification of different types of fire doors was creating greater fire safety risk than if the announcement had not been made, and the confusion is still there.”

Flat entrance fire doors in council housing stock

Local authorityTotal number of doorsFaulty doorsNumber replacedCosts identified (£)Notes
Adur1,500300181165000
Babergh500000
Barnet4,9004,90000
Blackpool858464646552
Bournemouth2,800000
Brighton & Hove6,9892,25400
Bristol5,550320310300000
Cheltenham2,368644162
Cheshire West & Chester1,850000
City of London2,703 Still surveying/testing
Colchester3,1392,960179180000
Corby238 Still surveying/testing
Cornwall1,168000
Croydon9,8221,52300
Dudley6,052400
East Kent Housing (Canterbury, Dover, Folkestone & Hythe, Thanet)6,563000
East Riding of Yorkshire3,937181515800
East Suffolk135000
Eastbourne3,000000
Epping Forest2,086000
Fareham1,003 Still surveying/testing
Gateshead1,968000
Gravesham2,021000
Greenwich8,8142980 Currently procuring contract
Guildford1,312000
Hammersmith & Fulham7,50323200
Haringey5,196238 428000Ongoing replacement
Harrogate350 Unknown number of faulty doors
Harrow3,65335040000
Havering7,039000
Hinckley & Bosworth28213012000
Hounslow11,298000
Ipswich1,780000
Islington9,3352,44800
Kensington & Chelsea5,34593101490000
Kettering49849800
Kingston upon Hull3,9851,725 1380000Ad hoc replacement
Kingston upon Thames2,1642050220000
Kirklees5,000500109125000
Lambeth25,4001,483450900000
Lancaster8508500
Leeds9,577000
Lewes1,10932960 Part of £1,020,503 programme
Lewisham1,276000
Medway1,2003800
Melton714000
Mid Devon455000
Mid Suffolk327000
Milton Keynes7,000 Still surveying/testing
New Forest1,400000
Newark & Sherwood1,415000
Newcastle upon Tyne8,166962 1443000Ongoing replacement
North Kesteven311222238429
North Tyneside1,320000
North West Leicestershire420000
Northumberland750000
Norwich10,3443500
Nottingham8,364000
Nuneaton & Bedworth1,308000
Oldham857000
Oxford3,48428 29400Ongoing replacement
Poole1,85688222907
Portsmouth7,0052,077102 No figure provided - contractor liable
Reading3,455774375
Redbridge3,1162,7663509348000
Richmondshire267000
Rotherham1,912 Still surveying/testing
Sandwell5,962000
Sedgemoor1,369000
Sheffield18,63011800
Shropshire250000
Slough3,800000
South Cambridgeshire360393951490
South Derbyshire3909400
South Holland986000
South Kesteven782000
South Tyneside1,957000
Southampton13,000574524856000
St Albans3,811000
Stoke-on-Trent1,393000
Stroud846000
Sutton3,4762,09703500000
Tamworth1,471000
Tandridge1935300
Tendring1,100000
Warwick2,10003970Doors replaced as part of high rise refurbishment
Waverley63612012000
Wealden899000
Welwyn Hatfield700 Still surveying/testing
Wigan2,603000
Wiltshire1,029000
Winchester1,32354040000
Woking400000
Wolverhampton7,1231,6091251700000
York2,800664200

Source: Data obtained from councils under the Freedom of Information Act

For instance, Portsmouth and Sutton councils have erred on the side of caution and interpreted all their GRP fire doors as faulty. The latter has committed to replace all these doors, having just begun a programme to replace 1,878 doors in 2019/20, costing an estimated £3.5m. Its ALMO, Sutton Housing Partnership, says the move “is part of our commitment to improving safety beyond the legally required minimum”. On the other hand, Norwich Council is using GRP products as replacements.

Mr Underwood explains that there are at least two different types of GRP doors – foam-filled and those with a laminated timber core – that are likely to perform differently in a test. However, both he and fire door consultant Neil Ashdown say that not enough information has been released about the MHCLG tests. That means it is difficult to know why doors fail – and therefore understand exactly what makes a door more or less likely to comply with standards.

“The problem is they didn’t say why the doors had failed,” says Mr Ashdown. “It could be that some configurations – types of glazing systems for example – are more susceptible to issues.” Meanwhile, government tests of timber doorsets are ongoing, but no fails have yet been recorded.

Mr Underwood is particularly concerned that the mistakes that led to inadequate fire doors being installed at Grenfell and elsewhere persist.

He is adamant that test data should not be taken as proof of a door’s compliance. A test report, he says, “is just a signpost in time” and could be years out of date, with the actual product made to a different specification with different materials.

“We still have building control asking for test reports in preference to third-party certification documents. It means there is still confusion out there,” he says.

“Certification is seen as the blue riband,” explains Mr Ashdown. “There is definitely a move towards that but I suspect it’s unlikely to become a mandatory requirement.”

Government advice on fire doors states that certification “will provide additional assurance of performance” but still accepts “carefully checked” test evidence.

In numbers

98

Councils included in survey, owning well over half of the country’s local authority housing stock

326,863

Number of fire doors on which we obtained data

33,522

Fire doors suspected not to meet 30-minute safety standard (10.3%)

2,689

Number of problem doors replaced so far (8%)

£22.3m

Total bill identified by councils so far

All this confusion means that, according to Lord Porter, even though the moratorium was lifted in December, “councils are struggling to confirm that the fire doors that have come back onto the market meet their requirements”.

Fire doors are one of the most fundamental elements of building safety, often key to preventing compartmentation from being breached. However, it appears that social landlords, the industry, building inspectors and the government are all unable to definitively describe what constitutes a compliant fire door.

The MHCLG says its line is unambiguous: “Building owners should ensure that products being used in their buildings meet the appropriate standards. Where doors that have failed tests are installed, we have been clear that building owners must take responsibility and should review their building fire risk assessments.”

This position relinquishes the onus of recommending which doors are safe, instead implying that if you do not think your fire doors are up to scratch, you should make sure other fire safety measures pick up the slack to mitigate the risk.

 

investigation 4

Lord Porter, chair of the LGA, says "councils have been failed"

 

But councils are not satisfied with this approach. Diarmaid Ward, executive member for housing and development at Islington Council, says the authority is still awaiting results from ongoing official tests of timber doors “in the absence of clear government guidance”. Similarly, Kettering Council says it is only able to replace doors ad hoc “after a detailed assessment and consultation with our framework partners” due to the lack of “definitive guidance”.

Brighton & Hove City Council is waiting to replace 2,254 doors, and says it is “pressing MHCLG for information on the type of doors we should use”.

Once landlords do know which doors to use, there is the question of money. The councils needing to replace doors in our survey have already identified a combined £22.3m bill. This will certainly rise as more replacement programmes are put in place, with many councils yet to calculate costs. Relatively conservative estimates put the rate at around £1,000 per door.

“Funding is clearly a massive challenge,” says Darren Rodwell, executive member for housing and planning at London Councils. “It’s unfair to expect local authorities to pick up the bill for manufacturers’ safety failings and for shortcomings in government regulation.”

If – as all parties ostensibly agree – residents’ safety is of paramount importance, it is vital that the hand-wringing and finger-pointing over costs that have played out so tortuously with the cladding scandal are not repeated.

Never Again campaign

Never Again campaign

In the days following the Grenfell Tower fire on 14 June 2017, Inside Housing launched the Never Again campaign to call for immediate action to implement the learning from the Lakanal House fire, and a commitment to act – without delay – on learning from the Grenfell Tower tragedy as it becomes available.

One year on, we have extended the campaign asks in the light of information that has emerged since.

Here are our updated asks:

GOVERNMENT

  • Act on the recommendations from Dame Judith Hackitt’s review of building regulations to tower blocks of 18m and higher. Commit to producing a timetable for implementation by autumn 2018, setting out how recommendations that don’t require legislative change can be taken forward without delay
  • Follow through on commitments to fully ban combustible materials on high-rise buildings
  • Unequivocally ban desktop studies
  • Review recommendations and advice given to ministers after the Lakanal House fire and implement necessary changes
  • Publish details of all tower blocks with dangerous cladding, insulation and/or external panels and commit to a timeline for remedial works. Provide necessary guidance to landlords to ensure that removal work can begin on all affected private and social residential blocks by the end of 2018. Complete quarterly follow-up checks to ensure that remedial work is completed to the required standard. Checks should not cease until all work is completed.
  • Stand by the prime minister’s commitment to fully fund the removal of dangerous cladding
  • Fund the retrofitting of sprinkler systems in all tower blocks across the UK (except where there are specific structural reasons not to do so)
  • Explore options for requiring remedial works on affected private sector residential tower blocks

LOCAL GOVERNMENT

  • Take immediate action to identify privately owned residential tower blocks so that cladding and external panels can be checked

LANDLORDS

  • Publish details of the combinations of insulations and cladding materials for all high rise blocks
  • Commit to ensuring that removal work begins on all blocks with dangerous materials by the end of 2018 upon receipt of guidance from government
  • Publish current fire risk assessments for all high rise blocks (the Information Commissioner has required councils to publish and recommended that housing associations should do the same). Work with peers to share learning from assessments and improve and clarify the risk assessment model.
  • Commit to renewing assessments annually and after major repair or cladding work is carried out. Ensure assessments consider the external features of blocks. Always use an appropriate, qualified expert to conduct assessments.
  • Review and update evacuation policies and ‘stay put’ advice in the light of risk assessments, and communicate clearly to residents
  • Adopt Dame Judith Hackitt’s recommended approach for listening to and addressing tenants’ concerns, with immediate effect

CURRENT SIGNATORIES:

  • Chartered Institute of Housing
  • G15
  • National Federation of ALMOs
  • National Housing Federation
  • Placeshapers

 

Linked InTwitterFacebookeCard
Add New Comment
You must be logged in to comment.